High-speed shredders reduce material by impact. Low-speed crushers reduce it by force. On fibre-reinforced cement board that difference decides how much airborne dust the process creates, how much material is lost as fines, whether metal fixings end up in the product fraction — and whether the machine can be installed inside a containment system at all.

The last of those is the one that matters most, and it is rarely discussed as an engineering question.

Two mechanisms

A high-speed shredder strikes the material. A rotor turning at several hundred RPM brings hammers or cutters into the feed at high velocity. Energy transfers in a short, violent impulse and the material fails because it cannot absorb the shock.

A low-speed crusher applies force. ACA machines turn at 15 RPM with up to 13,000 Nm of torque per shaft. Material is drawn in, gripped, and broken because the applied force exceeds what the board can carry. The energy goes in slowly.

Both produce broken board. Everything else about the two processes differs.

The airflow problem

A rotor at high RPM functions as a fan. It moves air through the chamber whether or not that is intended, and that airflow carries anything light enough to be carried.

On a fibre-reinforced mineral board that means fine particulate and released fibre moving at velocity, looking for an exit. In an open installation it is a dust problem. Inside a containment system it is a different and much harder problem: the extraction has to overcome a pressure differential the machine itself is generating, continuously, for the life of the installation. That is expensive to design around, expensive to run, and it is the reason a great deal of size-reduction equipment is simply unsuitable for enclosed service.

At 15 RPM there is no such airflow to overcome. The extraction system works against the dust the process creates, not against the machine. The containment can be sized for the process rather than for a fight with the equipment.

This is the whole reason a low-speed crusher can sit inside a licensed facility’s containment, and a high-speed one generally cannot.

What else impact costs you

Over-reduction. Impact does not stop at the target particle size. Material that has already reached size remains in the chamber and continues to be struck, so the fines fraction grows with residence time. Fines are a problem twice: they are the fraction most likely to become airborne, and the fraction a downstream receiver will reject.

Indifference to contaminants. A hammer does not distinguish cement board from a roofing screw. Fixings are struck, deformed and driven into the material rather than separated from it, which makes downstream magnetic separation substantially less effective. What should have been a recoverable steel fraction becomes contamination inside the product fraction.

Bad failure behaviour. An unexpected steel bracket entering a high-speed machine is a shock-load event. At best it stops the line; at worst it damages the rotor. Inside a containment system, an unplanned intervention is not simply a maintenance call — it is a controlled entry, with everything that implies.

What low speed changes

A narrower particle size distribution. Force-based reduction produces less fine material. Broken material moves out of the working zone instead of being struck repeatedly. More of the fraction you specified, less of the fraction nobody wants.

Fixings released rather than embedded. Screws, nails, washers and brackets separate from the board, which is what makes a downstream magnet worth installing.

Predictable failure behaviour. ACA machines detect overload and reverse automatically, clearing the obstruction and resuming. With multiple independently driven shafts, a jam in one zone does not stop the line. On material arriving with unknown fixings attached, and in an installation where manual intervention is a procedure rather than a five-minute job, this is not a convenience feature.

No contact between moving parts. There is no cutting clearance to maintain, no blade-on-blade wear, and no progressive degradation of output quality as tooling wears. On abrasive mineral material this is the difference between consistent output in year one and consistent output in year five — and it means fewer scheduled interventions inside the enclosure.

Electric drive. 100% electric, 75 dB at one metre when running empty, and without exhaust.

Both streams, two installations

ACA machines are built for asbestos-free fibre cement and for asbestos-containing material. What differs is the installation and who holds the licence.

Asbestos-free fibre cement can be processed at source or at a reception facility, with dust control appropriate to a fibre-bearing mineral material — enclosure and extraction sized for the process.

Asbestos-containing material is processed at a licensed facility. The machine is installed inside the customer’s containment — enclosure, negative pressure, pre-filtration and HEPA-grade final filtration — and operated under the asbestos regime in that jurisdiction, with the monitoring, decontamination and documentation that regime requires. The machine is designed for that environment. The permission to process the material comes from the facility’s licence, never from the equipment.

We state the limit as plainly as the capability: no machine makes asbestos safe. The fibre is destroyed or contained, and a crusher does neither. What a crusher does is reduce the material inside a system built to contain it. That is a specific, useful job, and it is one most equipment on the market cannot do — which is why most suppliers decline this material rather than engineer for it.

Eight questions for any supplier

  1. What is the operating speed, and what torque is available at that speed? Low RPM without adequate torque is a slow machine that stalls. The combination is the specification
  2. What airflow does the machine generate in normal operation? If the supplier has not measured it, they have not thought about enclosed service
  3. What is the particle size distribution of the output, and what percentage is fines? Ask for measured data on comparable material, not a target range
  4. What happens when a steel fixing enters the chamber? The answer should describe detection and a reverse sequence, not a shear pin and a call-out
  5. Has the supplier installed inside a containment system before, and what did they supply versus what did the facility supply? Retrofitting containment around equipment designed without it is expensive and rarely satisfactory
  6. How many planned interventions inside the enclosure does the machine require per year? Every one is a controlled entry
  7. How does output quality change as tooling wears? If the answer is vague, assume it degrades
  8. Will the supplier run your material before you buy? If not, ask why

The last question is the important one. Every material behaves differently, published specifications describe the best case, and the only honest answer to how will this run on my waste is to run it.

What it resolves into commercially

Containment that costs what it should. A process that does not generate its own airflow is a process whose extraction system is sized for the dust, not for the machine. That shows up in capital cost and again in running cost, every year.

Uptime, and fewer entries. Automatic reverse, independently driven shafts and non-contacting moving parts produce a machine that keeps running when material arrives with surprises in it — and one that needs the enclosure opened less often.

A product fraction with a value. Consistent sizing, low fines, metal removed. That is a fraction a receiver can specify against, whether the receiver is a cement producer or a treatment process. The requirement list is in what fibre cement waste must look like to have a value.

Volume, which is the cost nobody itemises. Covered in what volume costs when cement sheeting fills a container.

Frequently asked

Why is a low-speed crusher better than a shredder for fibre cement?

Because it breaks the board by applying force rather than impact. It generates no significant airflow through the chamber, produces far less fine material, and releases metal fixings instead of embedding them. The airflow point is decisive for enclosed installations, where extraction would otherwise have to overcome a pressure differential the machine itself creates.

Can a crusher be installed inside an asbestos containment system?

Yes, where the machine is designed for it. ACA machines are built to be installed inside a licensed facility’s containment — enclosure, negative pressure and filtration — and operated under the applicable asbestos regime. The licence belongs to the facility, not to the equipment.

Does low-speed crushing eliminate dust?

No. It reduces dust generation substantially compared with high-speed equipment, and it makes containment practical to engineer. It does not replace containment, and no machine makes asbestos-containing material safe.

What particle size does the output come out at?

That depends on the material, the configuration and the target. The reliable answer comes from running a sample of your own material.

Run your material before you specify

Send us a sample. We will process it, measure the output fraction, and give you throughput figures for your material and a view on what the installation would need to be.

Book a test run · +45 24 82 25 82 · info@acaindustry.com

w

Support 24/7

We provide support 24/7, so we are always easy to get hold of. Don't hesitate to call us if you have a problem. We'll find a solution to your problem, so you can move on.

Would you like us to give you a call?

ACA Industry ApS

DK-5220 Odense SØ

Denmark